MEGA-Deal
    ►►►    
up to
-33%
total discount
Only until 19.04.2024

Installation and assembly

Provisional and solution-oriented service

When you order your new doors and windows from FENSTERNORM you can also take advantage of our installation services. We will arrange an appointment together that is the most suitable for you and keep it strictly. Our technicians and installers will appear on time at your construction site and will install your window in a prompt and professional way.

The customer's satisfaction is very important for us and that's why our employees will take care of the correct and precise installation of  your windows and doors. They will also leave your home/office clean and in order. After our employees are done there will be hardly any major traces of installation left.


An installation according to ÖNORM B5320

FENSTERNORM offers for different installation methods:

  • Shell construction
  • Replacement of new construction without plastering services
  • Replacement of new construction including plastering services
  • Replacement of an old construction without plastering services
  • Replacement of an old construction including plastering services

All installation work is strictly implemented in accordance to ÖNORM B5320. This norm is oriented to the German norm DIN 4108  "Wärmeschutz und Energie-Einsparung in Gebäuden - Teil 7" (heat protection and energy saving in buildings - part 7). According to this norm, the sealing of window sills at construction sites should be impermeable and driving rain resistant. We follow the 'inside tighter than outside' rule which makes it possible that the sealing absorbs and damps the temperature influences, the effects of wind or vibrations effectively.


Our condition for installation

Distance to Vienna Minimum amount of the order

Up to 100 km

€ 1000,-

Up to 200 km

€ 2500,-

Over 200 km

upon enquiry

Installation steps

Installation steps

Shell construction
(installation only )
New construction
without plastering
New construction
with plastering
Old construction
without plastering
Old construction
with plastering
The old window is cut up from the window soffit, it's removed and can be disposed of (for an additional charge).
The new window will be adjusted in the window soffit and mounted with the help of mounting screws.
requires smooth reveal
The diffusion bands that are required according to ÖNORM are glued to the window profile and they are prepared to be stuck together with wall opening.
The window is sealed with PU- insulation-foam and the supernatants of the foam are suspended after it is completely solidified.
The diffusion bands are glued to the opening with the help of different adhesive means.
a) butyl adhesive tape b) window sealant adhesive
a b b b b
The window benches are fixed if there are included in the offer.
The window profile is plastered inside and out so that the border area is covered.

Installation prices

Installation type

Shell construction
(installation only )
New construction
without plastering
New construction
with plastering
Old construction
without plastering
Old construction
with plastering
Installation of windows/balcony doors €39,- /RMT €49,- /RMT €79,- /RMT €89,- /RMT €129,- /RMT
Installation of entrance doors €44,- /RMT €54,- /RMT €84,- /RMT €94,- /RMT €134,- /RMT
Installation of sliding systems €69,- /RMT €79,- /RMT €109,- /RMT €119,- /RMT €159,- /RMT

Everything's clear?

Our FENSTENORM team is happy to assist you, should you need any further information.