Your new windows. Installed.
Installation and assembly
Choose your windows. We take care of measuring, delivery and professional installation.
- Everything from one source
- Our own fitting team
- Fitted to ÖNORM B 5320
- Window replacement from €70,80 per running metre incl. 20 % VAT
Installation prices
All prices on this page include 20 % VAT. The table shows prices per running metre (lfm) of window perimeter. Running metres = 2 × (width + height): a 90 × 110 cm window has 4 lfm.
- Minimum installation charge: €540,00 per order, for the installation work only, without disposal and access. If the installation costs less, the difference is a separate line in the offer.
- Access charge: €60,00 up to 25 km driving distance from 1230 Vienna, plus €1,20 per km beyond that. We install across Austria at these prices.
Shell construction (installation only) / ÖNORM B5320
| Windows and balcony doors | €51,60 |
| Front and entrance doors | €96,00 |
| Lift-and-slide doors | €82,80 |
| Folding sliding doors | €94,80 |
| Disposal per m² | not applicable |
Window/door replacement without plastering work
| Windows and balcony doors | €70,80 |
| Front and entrance doors | €115,20 |
| Lift-and-slide doors | €102,00 |
| Folding sliding doors | €114,00 |
| Disposal per m² | €48,00 |
Window/door replacement incl. plastering work (rough plaster)
| Windows and balcony doors | €94,80 |
| Front and entrance doors | €139,20 |
| Lift-and-slide doors | €126,00 |
| Folding sliding doors | €138,00 |
| Disposal per m² | €48,00 |
Box-type window replacement (old building) without plastering work
| Windows and balcony doors | €106,80 |
| Front and entrance doors | €151,20 |
| Lift-and-slide doors | €138,00 |
| Folding sliding doors | €150,00 |
| Disposal per m² | €60,00 |
Box-type window replacement (old building) incl. plastering work (rough plaster)
| Windows and balcony doors | €142,80 |
| Front and entrance doors | €187,20 |
| Lift-and-slide doors | €174,00 |
| Folding sliding doors | €186,00 |
| Disposal per m² | €60,00 |
Flat rates and conditions
- Disposal of the old windows: price per m² of window area, by installation type (last column). It is preselected in the configurator; you can deselect it.
- Hourly rate for unforeseen extra work: €144,00 per hour or part of an hour.
- On-site measuring, only with installation: For measurements within 100 km of Vienna, a deposit of € 100 in cash is charged, which is deducted from the installation total upon ordering. From 100 km onwards, € 1.08/km gross is charged in cash for the journey.
- Roller shutters, external blinds, blinds, insect screens and window sills: the installation price is shown per product in the configurator and counts towards the minimum installation charge.
- The configurator shows the installation price for your window size. The minimum installation charge and the access charge are added in the cart.
Professional and solution-oriented service
When you order your new doors and windows from FENSTERNORM you can also take advantage of our installation services. We will arrange an appointment together that is the most suitable for you and keep it strictly. Our technicians and installers will appear on time at your construction site and will install your window in a prompt and professional way.
The customer's satisfaction is very important for us and that's why our employees will take care of the correct and precise installation of your windows and doors. They will also leave your home/office clean and in order. After our employees are done there will be hardly any major traces of installation left.

Installation
Shell construction installation work is strictly implemented in accordance to ÖNORM B5320. This norm is oriented to the German norm DIN 4108 "Wärmeschutz und Energie-Einsparung in Gebäuden - Teil 7" (heat protection and energy saving in buildings - part 7). According to this norm, the sealing of window sills at construction sites should be impermeable and driving rain resistant. We follow the 'inside tighter than outside' rule which makes it possible that the sealing absorbs and damps the temperature influences, the effects of wind or vibrations effectively.

Our condition for installation
If you have any questions, our team is always happy to assist you in person, by phone or by email.
Installation steps
|
Installation steps |
Shell construction (installation only) / ÖNORM B5320 | Window/door replacement without plastering work | Window/door replacement incl. plastering work (rough plaster) | Box-type window replacement (old building) without plastering work | Box-type window replacement (old building) incl. plastering work (rough plaster) |
|---|---|---|---|---|---|
| The old window is cut up from the window soffit, it's removed and can be disposed of (for an additional charge). | |||||
| The new window will be adjusted in the window soffit and mounted with the help of mounting screws. | requires smooth reveal |
||||
| The diffusion bands that are required according to ÖNORM are glued to the window profile and they are prepared to be stuck together with wall opening. | |||||
| The window is sealed with PU- insulation-foam and the supernatants of the foam are suspended after it is completely solidified. | |||||
| The diffusion bands are glued to the opening with the help of different adhesive means. a) butyl adhesive tape b) window sealant adhesive |
a | b | b | b | b |
| The window benches are fixed if there are included in the offer. | |||||
| The window profile is plastered inside and out so that the border area is covered. |
Everything's clear?
Our FENSTENORM team is happy to assist you, should you need any further information.